Fun Facts

  • Concrete Masonry Block – 62,000 Units Total – Stacked on top of each other end to end, this would reach 41,540 feet or 7.87 miles.
    Reference – Mariana Trench is roughly 6.86 miles deep, and Mt. Everest is 5.5 miles above sea level.
  • Brick – 23,000 Units Total – Stacked on top of each other end to end, this would reach 7,820 feet or 1.48 miles.
  • Steel – 210 tons total or 420,000 pounds.
  • Concrete – 1,100 cubic yards total – This comes out to approximately 4.5 million pounds total.
    Reference – A six inch concrete slab over Lambeau Field would take about 1,066 cubic yards of concrete.
  • Rebar – 72 Tons Total – 144,000 pounds.